Testing and commissioning services

BESS Commissioning Services Australia

Talk to an engineer: 1300 730 499 or service@megavar.com.au

Expert Battery Energy Storage System Commissioning Across Australia


Australia’s grid-scale battery storage market has grown exponentially, with 4.9 GWh of BESS commissioned in 2025 alone – more than the entire 2017–2024 period combined. As the energy transition accelerates, reliable BESS commissioning is critical to ensuring these complex systems perform safely, meet grid compliance requirements, and deliver the revenue outcomes that developers and investors require.
Megavar provides end-to-end BESS commissioning services for projects from 5 MW distributed batteries through to 500 MW+ grid-scale installations, anywhere in Australia. With 20+ years of high-voltage commissioning experience, a national fleet of Omicron test equipment, and deep understanding of NER and AEMO connection requirements, we deliver the technical rigour that BESS projects demand.

ISO 9001, 14001 and 45001 certifiedLicensed in every Australian stateTeams in Hobart, Launceston, Adelaide and Newcastle
Megavar engineer commissioning battery energy storage system BESS in Australia

What Is BESS Commissioning?

BESS commissioning is the systematic process of testing, validating, and energising a battery energy storage system to confirm it operates safely and in accordance with its design intent, manufacturer specifications, and grid connection requirements. Unlike traditional substation commissioning, BESS projects involve the integration of power conversion systems (PCS), battery management systems (BMS), thermal management, fire suppression, and real-time energy management software – all of which must be validated as a complete, functioning system before grid connection.

Our BESS Commissioning Process

Megavar’s commissioning methodology follows a structured, phased approach aligned with the National Electricity Rules (NER), AEMO connection procedures, and relevant network service provider (NSP) standards.

BESS Technologies We Commission

Megavar’s commissioning engineers have experience across all major grid-scale BESS technologies deployed in Australia, including Tesla Megapack, Fluence Gridstack, Samsung SDI, BYD, Sungrow, CATL, and Wuxi/Powin systems. We are technology-agnostic and work across all PCS and BMS platforms.

Test Equipment

Megavar maintains a 200+ instrument test equipment fleet spanning Omicron, Megger and other leading brands, including the Omicron CMC 356, CMC 500, CPC 100, CP CU1, CT Analyzer, and CIBANO 500 circuit breaker analyser. All equipment is professionally calibrated with certificates traceable to national measurement standards.

Why Choose Megavar for BESS Commissioning?

  • 20+ years’ HV commissioning experience applied to the specific requirements of BESS projects.
  • Omicron test equipment fleet – the preferred platform for modern digital protection and control.
  • National coverage: offices in Tasmania, SA, NSW and Queensland, deploying anywhere in Australia.
  • Independent and technology-agnostic – we work across all BESS manufacturers.
  • Grid compliance expertise – deep understanding of NER, AEMO processes, and NSP standards.
  • ISO 9001, 14001, 45001 certified – quality, environmental, and safety management certified.

Phase 1: Pre-Commissioning Review

  • Design verification – Review of single line diagrams, protection schematics, SCADA architecture, BMS configuration, and thermal management design against the connection agreement and Generator Performance Standards (GPS) requirements.
  • FAT result review – Assessment of factory acceptance test data for PCS inverters, transformers, switchgear, and battery modules to identify deviations prior to site installation.
  • Commissioning plan development – Preparation of detailed commissioning plans, inspection and test plans (ITPs), and hold-point schedules aligned with NSP and AEMO requirements.

Phase 2: Component-Level Testing

  • HV switchgear – Primary injection testing, contact resistance, insulation resistance, SF6 gas checks, and functional operation verification.
  • Power transformers – Turns ratio (TTR), winding resistance, insulation power factor (tan delta), SFRA, dissolved gas analysis (DGA), and vector group verification.
  • Protection relays – Secondary injection testing using Omicron CMC 356 and CMC 500. Verification of settings, trip times, and scheme logic for overcurrent, earth fault, differential, distance, and anti-islanding protection.
  • CT and VT testing – Ratio verification, polarity checks, burden measurements, and magnetisation curves using Omicron CT Analyzer.
  • Earthing system – Earth grid resistance, step and touch potential testing, and fault loop impedance verification.
  • DC systems – Battery charger testing, DC distribution, changeover schemes, and UPS verification.

Phase 3: System Integration Testing

  • SCADA and communications – End-to-end verification of SCADA point lists, DNP3/IEC 61850/Modbus protocols, alarm propagation, and remote control between the BESS EMS, site SCADA, and NSP/AEMO control room.
  • BMS integration – Validation of BMS communication with PCS and SCADA. Verification of SOC reporting, cell balancing, thermal alerts, and emergency shutdown sequences.
  • PCS functional testing – Charge/discharge cycling, power ramp rate verification, reactive power capability, frequency response validation, and grid-forming/grid-following mode switching.
  • Fire suppression – Functional testing of enclosure fire detection and suppression, including integration with BMS shutdown and SCADA alarm annunciation.

Phase 4: Grid Compliance and Energisation

  • R1/R2 hold-point testing – Execution of AEMO-required R1 and R2 hold-point tests to demonstrate compliance with generator performance standards: active power control, reactive power capability, voltage control, frequency response, and fault ride-through.
  • Energisation support – On-site engineering during HV energisation, transformer energisation, and first charge/discharge cycles.
  • Performance validation – Post-energisation monitoring and tuning to verify contracted capacity, round-trip efficiency, and response time specifications.

Take it to your team

Capability statement

BESS Commissioning and Maintenance

HV balance of plant commissioning from pre-commissioning review to AEMO R1 and R2 hold point testing, and annual maintenance of grid-scale battery energy storage systems.

Capability statement

Substation Commissioning Management

Commissioning strategy, inspection and test plans, hold points, energisation and handover under one accountable manager.

Clients

What our clients say

The Megavar team demonstrate professionalism and excellence in all aspects of HV electrical commissioning. It’s great to work with the team with the high standards of quality and safety that you would expect when dealing with complex high voltage installations, the experienced Megavar team has been exactly what was needed for project delivery.

Russell CunninghamCommissioning Manager | Fluence Energy

Megavar are industry leaders in HV commissioning services, offering high quality commissioning services. They are experts in high voltage commissioning services, and their work is always on time, on budget and to the highest quality.

Shaun ColtonEngineering Manager Substations & BESS, Downer Group

FAQ

Frequently Asked Questions BESS Commissioning Services Australia

What does BESS commissioning involve?

BESS commissioning systematically tests and validates every component of a battery energy storage system before it connects to the grid. This includes HV switchgear, power transformers, protection relays, power conversion systems (PCS), the battery management system (BMS), SCADA and communications, fire suppression, and earthing. The process culminates in AEMO R1 and R2 hold-point testing and supported energisation.

How long does BESS commissioning take?

Duration depends on BESS capacity and complexity. A 50 MW/100 MWh system typically requires 3–4 weeks of on-site commissioning. A 200 MW+ system may require 6–8 weeks. Pre-commissioning planning begins 4–8 weeks before mobilisation.

Does Megavar commission all BESS technologies?

Yes. Our engineers are technology-agnostic with experience across Tesla Megapack, Fluence Gridstack, Samsung SDI, BYD, Sungrow, CATL, and Powin systems, covering all PCS and BMS configurations.

What test equipment does Megavar use for BESS commissioning?

Megavar maintains a 200+ instrument test equipment fleet, including the Omicron CMC 356, CMC 500, CPC 100, CP CU1, CT Analyzer, and CIBANO 500. All calibrated with certificates traceable to national measurement standards.

Does Megavar support AEMO R1 and R2 hold-point testing?

Yes. R1/R2 testing is a core part of our BESS commissioning scope. We prepare test procedures, execute hold-point tests, and provide documentation required by AEMO and the relevant NSP to demonstrate generator performance standard compliance.

Can Megavar commission BESS projects anywhere in Australia?

Yes. We provide BESS commissioning nationally from offices in Tasmania, South Australia, New South Wales and Queensland, deploying to metropolitan, regional, and remote locations across all states and territories.

What standards apply to BESS commissioning in Australia?

BESS commissioning must comply with the National Electricity Rules (NER), AEMO connection procedures, relevant NSP standards, AS/NZS 3000, AS/NZS 62271 for switchgear, AS 60076 for transformers, and manufacturer-specific requirements. Megavar’s plans satisfy all applicable standards and connection agreement requirements.

ISO Certified and Licensed in Every State

Megavar is certified to ISO 9001 (quality), ISO 14001 (environment) and ISO 45001 (safety), and holds electrical contractors licences in every Australian state.

Ready to commission your BESS project? Contact Megavar today on 1300 730 499 or visit our contact page to request a quote.

Contact Us

Request a quote

Tell us about the job

An engineer replies by the end of the next business day (Monday to Friday, 8:30 am to 5:00 pm). Scope still forming? Send what you have. Outage or urgent fault? Call to discuss the site, access window and mobilisation.

Scope status
Drag & Drop Files, Choose Files to Upload

* Required.

Megavar Pty Ltd (ABN 88 104 344 765) collects these details, and any file you attach, to prepare your quote, respond to your enquiry and keep a record of it, and to understand how enquiries reach us. If you do not provide them we may not be able to quote. We may share them with our IT, email and business system providers and, where relevant, our insurers and professional advisers, and some of those providers store or process information outside Australia, including in the United States. Our Privacy Policy explains how we handle your information and how to access or correct it or make a complaint.

Talk to us now
1300 730 499 service@megavar.com.au Hobart · Launceston · Adelaide · Newcastle · Gladstone
Doing it in-house?Hire battery test equipment

Explore Our other services

Independent HV substation commissioning from 11 kV to 500 kV. Protection, SCADA, IEC 61850 and energisation support by Megavar engineers. Call 1300 730 499.

Wind farm EBoP maintenance and testing by Megavar – relay testing, transformer condition assessment, switchgear servicing, and DGA monitoring. Australia-wide.

Arc flash studies to IEEE 1584-2018: incident energy, arc flash boundaries, PPE categories and the protection changes that cut risk. Australia-wide.

Trusted by top enterprises for exceptional results

AusNet logo - Megavar clientABB logo - Megavar clientElectraNet logo - Megavar clientFluence logo - Megavar clientRJE Global logo - Megavar clientNYRStar logo - Megavar clientSchneider Electric logo - Megavar clientAcciona logo - Megavar clientRBD Electrical logo - Megavar clientVentia logo - Megavar clientGrange logo - Megavar clientAlcoa logo - Megavar clientZinfra logo - Megavar client Bison Energy Company logo - Megavar client Hydro Tasmania logo - Megavar client TasNetworks logo - Megavar clientVestas logo - Megavar client Goldwind logo - Megavar client Downer logo - Megavar client ENERVEN logo - Megavar client Genus logo - Megavar client

Testing guides

Related testing guides

Protection Relay Testing: Secondary Injection, Test Intervals and the Standards That Apply

Protection relay testing proves that the relays guarding a substation, feeder or generator will trip when they should and stay stable when they should not. This…

Power Quality Testing: A Field Guide to Logging and Analysis at the Point of Connection

Power quality testing logs voltage and current at a point of connection for days and analyses the record for voltage, unbalance, harmonics, flicker, dips, swells, interruptions…

Insulation Resistance Testing: A Field Guide to Megger Testing, PI and DAR on HV Plant

An insulation resistance test applies a steady DC voltage across insulation and measures the small current that flows. This guide explains the test voltage to use,…

All testing guides

Testing services
Engineers Australia-wide
Request a quote