Testing and commissioning services
Talk to an engineer: 1300 730 499 or service@megavar.com.au
Independent EBoP Commissioning for Onshore Wind Projects
Australia’s onshore wind capacity exceeds 12 GW across more than 100 operating wind farms, with a further pipeline of projects in development across every state. The electrical balance of plant (EBoP) — everything from the turbine terminals to the grid connection point — must be independently commissioned to ensure safe energisation, grid compliance, and long-term operational reliability.
Megavar provides independent windfarm HV commissioning services for the complete EBoP scope, ensuring that the electrical infrastructure your wind farm depends on has been tested by an impartial party — not the same company that built it.
We execute AEMO R1 and R2 hold-point tests including active power capacity, reactive power capability, voltage control, frequency response (PFR, contingency FCAS), and fault ride-through. We also support commissioning of grid-forming inverter capability where specified.
Partner with Megavar for independent, reliable, and expert Windfarm HV Commissioning. Contact us today!
Capability statement
Commissioning strategy, inspection and test plans, hold points, energisation and handover under one accountable manager.
Capability statement
Primary plant testing, protection and SCADA commissioning, substation maintenance and the design capability behind them.
FAQ
EBoP commissioning covers all electrical infrastructure except the turbines themselves: grid connection substation, MV collector network, turbine step-up transformers, MV/HV cables, protection systems, SCADA, wind farm controller, and earthing. It includes AEMO R1/R2 hold-point testing and supported energisation.
Megavar is certified to ISO 9001 (quality), ISO 14001 (environment) and ISO 45001 (safety), and holds electrical contractors licences in every Australian state.
Ready to commission your substation? Contact Megavar today on 1300 730 499 or visit our contact page to request a quote.
Request a quote
An engineer replies by the end of the next business day (Monday to Friday, 8:30 am to 5:00 pm). Scope still forming? Send what you have. Outage or urgent fault? Call to discuss the site, access window and mobilisation.



Testing guides
Protection relay testing proves that the relays guarding a substation, feeder or generator will trip when they should and stay stable when they should not. This…
VLF testing applies AC at 0.1 Hz to an MV or HV cable to prove its insulation, joints and terminations. This guide explains the withstand levels…
An insulation resistance test applies a steady DC voltage across insulation and measures the small current that flows. This guide explains the test voltage to use,…