Testing and commissioning services

Power System Studies Australia

Talk to an engineer: 1300 730 499 or service@megavar.com.au

Engineering Analysis That Underpins Safe, Reliable HV Systems


Power system studies are the analytical foundation for high-voltage design, protection coordination, and regulatory compliance. Whether connecting a new generator to the NEM, upgrading an existing substation, or assessing installation safety, Megavar’s engineers deliver the technical studies required.

ISO 9001, 14001 and 45001 certifiedLicensed in every Australian stateTeams in Hobart, Launceston, Adelaide and Newcastle
Power system modelling and protection coordination study for Australian substation

Load Flow Analysis

Load flow studies determine steady-state voltage, current, and power flows under normal and contingency conditions. We verify equipment ratings, voltage limits, and capacity for planned growth or generation. Studies per NER requirements and NSP planning standards.

Short Circuit Analysis

Short circuit studies calculate prospective fault currents to verify switchgear and protection ratings. We calculate three-phase, SLG, L-L, and DLG faults including synchronous, inverter-based, motor, and network contributions. Per IEC 60909 and AS/NZS 3851.

Protection Coordination Studies

Protection grading ensures devices operate in correct sequence to isolate faults with minimum disruption. We develop time-current curves for relays, fuses, and reclosers, and calculate settings for distance, differential, and special schemes.

Harmonic Analysis

Harmonic studies assess non-linear load and IBR impacts on power quality. We model sources, calculate distortion at the POC, and verify compliance with AS/NZS 61000.3.6. Harmonic filter design where required.

Arc Flash Studies

Arc flash analysis per IEEE 1584 calculates incident energy to determine PPE categories and safe working distances. We provide arc flash labels for all equipment. Essential under AS/NZS 4836 and WHS regulations.

Earthing Studies

EPR calculations, step and touch voltage analysis, earth grid optimisation, and transfer potential assessment per ENA EG-0, ENA EG-1 and AS 2067:2016.

Software Platforms

Proficient in ETAP, DIgSILENT PowerFactory, SKM Power Tools, and CAPE. We work within your existing models or build new ones from SLDs and equipment data.

Take it to your team

Capability statement

Arc Flash and Power System Studies

Arc flash studies to IEEE 1584 with PPE and label schedules, plus load flow, short circuit, protection coordination, harmonic and earth potential rise studies.

Capability statement

High-Voltage System Design

Primary, secondary, protection and SCADA design, with earthing, EMF and lightning protection modelling.

Clients

What our clients say

For years, we have engaged Megavar for design, testing and commissioning services on HV construction projects. They are professional, knowledgeable, and responsive which consistently leads to positive outcomes on our projects.

Brendan StarkProject Manager / Estimator

From my first phone call with MegaVar I knew our values aligned. MegaVar pride themselves on building successful working relationships, their service is underpinned by industry best practices and coupled with a “can do” attitude to successfully achieve our project requirements, and our customers high expectations.

Justin TurnerRJE Global Project Manager

FAQ

Frequently Asked Questions Power System Studies Australia

What is a protection coordination study?

A grading study ensures protection devices operate in correct sequence – the device closest to a fault trips first, upstream devices only if the downstream fails. Produces time-current coordination curves and recommended relay settings.

Do I need an arc flash study?

If workers operate on or near energised equipment, an arc flash study is strongly recommended and may be required under WHS regulations. It determines incident energy, PPE category, and provides warning labels.

What software does Megavar use?

ETAP, DIgSILENT PowerFactory, SKM Power Tools, and CAPE. We select the best platform per study requirements.

Can Megavar model inverter-based resources?

Yes. Our engineers model solar PV, wind, and BESS systems where IBR fault current contributions differ significantly from synchronous generation.

How long does a study take?

A focused protection study for a single substation: 2–4 weeks. A comprehensive load flow, short circuit, and coordination study for a new grid connection: 6–10 weeks.

ISO Certified and Licensed in Every State

Megavar is certified to ISO 9001 (quality), ISO 14001 (environment) and ISO 45001 (safety), and holds electrical contractors licences in every Australian state.

Ready to commission your substation? Contact Megavar today on 1300 730 499 or visit our contact page to request a quote.

Contact Us

Request a quote

Tell us about the job

An engineer replies by the end of the next business day (Monday to Friday, 8:30 am to 5:00 pm). Scope still forming? Send what you have. Outage or urgent fault? Call to discuss the site, access window and mobilisation.

Scope status
Drag & Drop Files, Choose Files to Upload

* Required.

Megavar Pty Ltd (ABN 88 104 344 765) collects these details, and any file you attach, to prepare your quote, respond to your enquiry and keep a record of it, and to understand how enquiries reach us. If you do not provide them we may not be able to quote. We may share them with our IT, email and business system providers and, where relevant, our insurers and professional advisers, and some of those providers store or process information outside Australia, including in the United States. Our Privacy Policy explains how we handle your information and how to access or correct it or make a complaint.

Talk to us now
1300 730 499 service@megavar.com.au Hobart · Launceston · Adelaide · Newcastle · Gladstone
Doing it in-house?Hire a power quality analyser

Explore Our other services

Power transformer testing and commissioning across Australia. Ratio, winding resistance, SFRA, tan delta and oil diagnostics with a 200+ item test fleet.

On-site resonant hipot testing of HV cables, GIS and power transformers to 500 kV, with partial discharge, on Megavar-owned sets. Call 1300 730 499.

BESS commissioning for grid-scale battery projects. Protection, coupling transformer and grid integration testing by Megavar engineers Australia-wide.

Trusted by top enterprises for exceptional results

AusNet logo - Megavar clientABB logo - Megavar clientElectraNet logo - Megavar clientFluence logo - Megavar clientRJE Global logo - Megavar clientNYRStar logo - Megavar clientSchneider Electric logo - Megavar clientAcciona logo - Megavar clientRBD Electrical logo - Megavar clientVentia logo - Megavar clientGrange logo - Megavar clientAlcoa logo - Megavar clientZinfra logo - Megavar client Bison Energy Company logo - Megavar client Hydro Tasmania logo - Megavar client TasNetworks logo - Megavar clientVestas logo - Megavar client Goldwind logo - Megavar client Downer logo - Megavar client ENERVEN logo - Megavar client Genus logo - Megavar client

Testing guides

Related testing guides

Power Quality Testing: A Field Guide to Logging and Analysis at the Point of Connection

Power quality testing logs voltage and current at a point of connection for days and analyses the record for voltage, unbalance, harmonics, flicker, dips, swells, interruptions…

Protection Relay Testing: Secondary Injection, Test Intervals and the Standards That Apply

Protection relay testing proves that the relays guarding a substation, feeder or generator will trip when they should and stay stable when they should not. This…

Earth Resistance Testing: Substation Earth Grids, Fall of Potential and Step and Touch Voltages

Earth resistance testing shows whether an earth electrode or substation earth grid will carry fault current safely into the ground. This guide explains the fall-of-potential method,…

All testing guides

Testing services
Engineers Australia-wide
Request a quote